Friday 27th July 2018

Update: Loss of utility power at FRA1 / still running on generators

The power to our FRA1 data centre is still being provided by generators. These are supplying the site in an N+1 redundant configuration. The reason for this is due to a problem with one of the data centre’s transformers which is preventing our Provider from switching back to utility power following a utility power issue caused by their grid supplier yesterday evening.