Monday 30th July 2018

Update: Loss of utility power at FRA1 / FRA1.1 is still running on generators

The power for our FRA1.1 Data Centre continues to be provided by generators in an N+1 redundant configuration. Stability has been maintained throughout with no interruptions.

Works have commenced to install the temporary generator. We are estimating works will be completed by the end of today, these works include the intention to transfer all work load back to utility power as per our previous communications.

Separately to this and in parallel our data center provider is also engaged with the transformer manufacturer to determine root cause of the issue.

The next update will be after completion of the generator installation.