Wednesday 1st August 2018

Update: Loss of utility power at FRA1 / FRA1.1 is still running on generators

We would like to inform you that the power for our FRA1.1 Data Centre continues to be provided by generators in an N+1 redundant configuration. Stability has been maintained throughout with no interruptions.

Installation of the temporary generator has been successfully completed. The testing of the switch over revealed some unexpected issues, all of which have been resolved yesterday. Therefore the transfer of the work load back to utility power and the IT load to the temporary gensets, is now scheduled for tomorrow morning (Wednesday 1st of August).

The root cause analysis of the transformer failure continues to be progressed in parallel to these activities.

The next update will be later today morning upon completion of the load transfer.